top of page
Work of truck crane on bridge project works Roundabout traffic bridge construction and hig

Temporary Works.

​​​We apply the rigour of permanent design to temporary conditions, prioritizing construction sequencing, alternate load paths, and realistic field tolerances. Our practice focuses on complex, constrained environments: occupied podiums, heavy load transfers, and structural interventions where deflection limits and service continuity are critical.

To mitigate fit-up risk on complex retrofits, we utilize 3D Scanning where appropriate to capture existing site geometry. Designs are modeled in 3D for spatial coordination; we deploy web-based model viewers to bridge the gap between office and field, providing site teams with interactive context to supplement the calculation package.

AREAS OF EXPERTISE:

  • Shoring & Reshoring: Slabs, beams, transfer elements, and podium decks.

  • Formwork & Falsework: Design for vertical and horizontal elements, including climbing systems and complex geometries.

  • Hydraulic Jacking: Multi-point load transfer schemes and de-jacking procedures.

  • Structural Interventions: Column/wall load bypass, needle beams, and local strengthening.

  • Façade Retention: Support for cladding, canopies, and secondary steel.

  • Plant Support: Engineered bases for cranes, hoists, and MEWPs.

  • Staged Analysis: Construction sequencing and load redistribution checks.

  • Peer Review: Rationalization of proprietary or contractor-proposed schemes.

  • Fabrication Detailing: Connection design, erection sequencing, and access planning.

Every Phase. One Firm. One Point of Accountability.

CWB Certified Welding Facility

461 North Service Rd West, Unit B34

Oakville ON L6M 2V5

Engineering North

3 Brookside Dr.

North Bay ON P1A 0A1

Contact

Enable Inc.

1-647-250-7377

info@enable-inc.com

Engineering GTA West

1507 Barker Ave

Burlington ON L7P 2R3

Engineering GTA East

117 Brillinger St.

Richmond Hill ON L4C 8Y3

Every Phase. One Firm.
One Point of Accountability.

canadian_flag_fixed.png
Screenshot 2026-03-25 130300.png
Screenshot 2026-03-25 124438.png
cwb cert.jpg
bottom of page